top of page

villas

GOPR3138.JPG
VILLAS

Corail

Bleu

PDS of 9 Villas of standard finish, the project was completed in 18 months.

BAIN BOEUF

Capture d’écran 2020-05-25 à 19.16.49.

900 SQM Villa A25 in Anahita Estate overlooking the Golf Course and the sea. Very high end finish with a 20m pool, the project was completed in 16 months

ANAHITA WORLD CLASS SANCTUARY - BEAU CHAMPS

Anahita A25

VILLAS

Construction of 13 PDS Villas of standard finish. Foundation went 3m deep due to nature of soil but the main difficulty was to work in an occupied residential estate with restrictions to working hours and protection of tarred road and neighbouring properties.

MATALA PROPERTIES ENTRANCE OF BLACK RIVER GORGES NATIONAL PARK

VILLAS

Matala

matala-4.jpg
LLB3 (2).jpg
VILLAS

Lataniers

Bleu

Construction

of 6 Beachfront Villas 

BLACK RIVER

APARTMENTS

Eco Lodges

Perched at the top of Chamarel, 11 lodges constructed on a very tricky sloping site that triggered big logistics challenges

SOCIETE LAVILLEON - MR SWALEY RAMJANE -  CHAMAREL

 

VILLAS
gallery-4.jpg

APARTMENTS

Started in January 2015, this PDS project of 24 Apartment units is split in 4 Blocks of 6 Units in a Ground + 2 configuration. Semi basement constructed under 2 of the Blocks provided parking facilities. The 8 penthouses on the Second Floors had individual RC structure swimming pools.

2 FUTURES - BAIN BOEUF

APARTMENTS
Home page.jpg

Element

Bay 2

Palm Bay

PDS Project of 11 Contemporary design beachfront apartments in Tamarin. Configuration of 3 Blocks of Ground + 2. Pitch roofs are in timber structure with slate tiles coverings. 

PALM BAY VILLAS LTD - MR BRENT SUSSENS - TAMARIN

20191210_130234.jpg
APARTMENTS

PDS Project of 14 Upmarket beachfront Apartments in 4 Blocks. Basement parking under 2 Main Blocks. The challenges of this project were water infiltration from the sides while constructing the basement and the suspended swimming pools.

2 FUTURES/HORIZON - MAIN ROAD BLACK RIVER

APARTMENTS

Manta Cove

20191210_121409.jpg
IMG_0523.jpg
APARTMENTS

Care Home

48 Rooms in a Basement, Ground + 4 building in the corner of a very busy street in Curepipe, this project presented many challenges in terms of the logistics of material deliveries and the frequency of rainfall.

NEMORIN MEDICALS - CUREPIPE

HOTEL CONSTRUCTION

AND RENOVATIOn

GOPR3546.jpg
HOTEL CONSTRUCTION

Anelia Resort

Addition of 108 New Rooms in 6 Blocks of 18 Rooms with a new Main Swimming Pool and other facilities to the then Klondike Hotel. 

COLORADO LTD - DAVID CHUI WAN CHEONG
FLIC EN FLAC

Construction of 12 New Villas with individual pools and associated works on the site that housed the previous SPA of Tropicale Attitude. Challenge obviously was to work next to the existing Tropicale Attitude Hotel that was in operation. 

ATTITUDE RESORTS  -  TROU D'EAU DOUCE

HOTEL CONSTRUCTION

Villas Tropical

Attitude

IMG-20200226-WA0017.jpg
New renovation.JPG
HOTEL RENOVATION

Sensimar Lagoon

Fast Track project of 3 Months. Complete uplifting of rooms to create 11 suites with individual Jacuzzis. Major refurbishment to the Main Restaurant, Reception, Gate Post, Beach Restaurant and 83 Rooms amongst other works. Was our first Hotel refurbishment for a then 3yr old Company and we completed the works on time and to the satisfaction of the Client and Consultant Team.

ATTITUDE RESORTS
ANSE LA RAIE

Fast Track project of 3 Months.  Addition of New Rooms to an additional Floor on the existing blocks. Addition of 1 Block of New Rooms in a Ground + 2 building. Major refurbishment to the Main Restaurant, Reception, Gate Post, Beach Restaurant and Rooms amongst other works. 

ATTITUDE RESORTS
BAIN BOEUF

HOTEL CONSTRUCTION

Coin de Mire

Attitude

New structure + pool tiling.JPG
New structure.jpg
REFURBISHMENT

Tropical

Attitude

FAST Track project of 3 Months. New Reception area and new flooring and buffet area to Main restaurant. Refurbishment of all rooms and major services upgrade

ATTITUDE RESORTS - TROU D'EAU DOUCE

Refurbishment of all rooms, done floor by floor with a tight deadline, whilst Hotel stayed in operations

INDIGO HOTELS  -  PORT LOUIS

REFURBISHMENT

Hotel

Labourdonnais

Coffee-Lounge-1-SMALL.jpg
226822121.jpg
REFURBISHMENT

Le Suffren

Hotel

10 weeks deadline for that Fast Track project. Major uplift to the public area and restaurant. Addition of new event area and refurbishment of all rooms. One of the highlights of our portfolio.

INDIGO HOTELS - PORT LOUIS

OFFICE BUILDINGS

Construction of Three Storey Building including all MEP services, a concrete underground STP & Water tank

2 FUTURES - POINTE AUX CANNONIERS

OFFICE BUILDINGS

MCBQ IQ

be40dcecc2c5788_t_w_1280_h_1024.jpg
End 3.jpg
OFFICE BUILDINGS

Office

Buildings SRF

Construction of Two ground plus one Commercial Buildings including MEP services, Metal sheets roofing, dry wall partition and aluminum openings

SOCIETE ROUILLARD FRERES - ROUILLARD

INDUSTRIAL

AND COMMERCIAl

GOPR3579.jpg
INDUSTRIAL

Vivo Energy

Creation of containment infrastructure around HFO tanks.

Upgrading of drainage system around tank farm.

PORT LOUIS

IMG_20190622_153920.jpg
COMMERCIAL

KFC

FIT OUT TO KFC OUTLETS

PICK N EAT LTD
GOODLANDS, BEAU BASSIN AND CUREPIPE

REFURBISHMENT AND EXTENSION OF EXISTING BUILDINGS TO CREATE NEW TYRE CENTRE

ACC - SWALEY RAMJANE - GRNM

INDUSTRIAL

ACC

GOPR3327.jpg
INDUSTRIAL

Autocheck

REFURBISHMENT OF EXISTING FITNESS CENTRE

AUTOCHECK LTD - PLAINE LAUZUN

CONSTRUCTION OF UNIVERSITY CAMPUS CANTEEN

MEDINE LTD - CASCAVELLE

INDUSTRIAL

Campus

Canteen

IMG_20180220_135529.jpg
20160125_130424.jpg
INDUSTRIAL

Laurelton Diamonds

FACTORY EXTENSION TO EXISTING PREMISES

ROSE BELLE

bottom of page